各地級(jí)以上市人民政府,省有關(guān)部門,各有關(guān)企業(yè):
經(jīng)省人民政府同意,現(xiàn)將《廣東省促進(jìn)新型儲(chǔ)能電站發(fā)展若干措施》印發(fā)你們,請(qǐng)結(jié)合實(shí)際抓好貫徹落實(shí)。
廣東省發(fā)展改革委
廣東省能源局
2023年5月30日
廣東省促進(jìn)新型儲(chǔ)能電站發(fā)展若干措施
根據(jù)《廣東省推動(dòng)新型儲(chǔ)能產(chǎn)業(yè)高質(zhì)量發(fā)展指導(dǎo)意見》(粵府辦〔2023〕4號(hào))要求,為促進(jìn)我省新型儲(chǔ)能電站規(guī)?;行虬l(fā)展,助力將新型儲(chǔ)能產(chǎn)業(yè)打造成為我省戰(zhàn)略性支柱產(chǎn)業(yè),制定以下措施。
一、拓展多元化應(yīng)用
(一)推進(jìn)新能源發(fā)電配建新型儲(chǔ)能。按照分類實(shí)施的原則,2022年以后新增規(guī)劃的海上風(fēng)電項(xiàng)目以及2023年7月1日以后新增并網(wǎng)的集中式光伏電站和陸上集中式風(fēng)電項(xiàng)目,按照不低于發(fā)電裝機(jī)容量的10%、時(shí)長1小時(shí)配置新型儲(chǔ)能,后續(xù)根據(jù)電力系統(tǒng)相關(guān)安全穩(wěn)定標(biāo)準(zhǔn)要求、新能源實(shí)際并網(wǎng)規(guī)模等情況,調(diào)整新型儲(chǔ)能配置容量;鼓勵(lì)存量新能源發(fā)電項(xiàng)目按照上述原則配置新型儲(chǔ)能。可采用眾籌共建(集群共享)、租賃或項(xiàng)目自建等方式落實(shí)儲(chǔ)能配置,其中第一種方式由項(xiàng)目所在地市組織布局落實(shí)。配置新型儲(chǔ)能電站投產(chǎn)時(shí)間應(yīng)不晚于項(xiàng)目本體首次并網(wǎng)時(shí)間,原則上不跨地市配置。爭取到2025年,全省新能源發(fā)電項(xiàng)目配建新型儲(chǔ)能電站規(guī)模100萬千瓦以上,到2027年達(dá)到200萬千瓦以上,“十五五”期末達(dá)到300萬千瓦以上。(省能源局,各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局,各有關(guān)發(fā)電企業(yè)負(fù)責(zé))
(二)規(guī)劃引導(dǎo)獨(dú)立儲(chǔ)能合理布局。按照合理布局、按需建設(shè)的原則,電網(wǎng)企業(yè)牽頭研究提出在新能源大規(guī)模匯集而消納受限地區(qū)、電力需求波動(dòng)大、輸電走廊和站址資源緊張等區(qū)域的獨(dú)立儲(chǔ)能電站規(guī)劃布局建議,明確合理配置的規(guī)模、布點(diǎn),鼓勵(lì)各類社會(huì)資本積極參與投資建設(shè)。(省能源局,各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(三)持續(xù)提升火電聯(lián)合儲(chǔ)能調(diào)節(jié)能力?;痣姍C(jī)組合理配置新型儲(chǔ)能電站,聯(lián)合參與調(diào)頻、備用等輔助服務(wù)市場交易,持續(xù)拓寬火儲(chǔ)聯(lián)調(diào)的應(yīng)用場景,加強(qiáng)示范項(xiàng)目跟蹤評(píng)估。(省能源局,有關(guān)地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局,各有關(guān)發(fā)電企業(yè)負(fù)責(zé))
(四)大力鼓勵(lì)用戶側(cè)儲(chǔ)能發(fā)展。按照因地制宜、靈活多樣的原則支持工商業(yè)企業(yè)、產(chǎn)業(yè)園區(qū)等配建新型儲(chǔ)能電站。精密制造、通信、金融等用電量大且對(duì)供電可靠性、電能質(zhì)量要求高的電力用戶,按需配置新型儲(chǔ)能電站。加快推動(dòng)分布式新能源、微電網(wǎng)配置新型儲(chǔ)能電站,推動(dòng)工業(yè)園區(qū)、商業(yè)樓宇開展冷、熱、電、儲(chǔ)綜合能源服務(wù)。(省能源局、工業(yè)和信息化廳,各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(五)積極推進(jìn)虛擬電廠建設(shè)。推動(dòng)新型儲(chǔ)能電站與工業(yè)可控設(shè)備負(fù)荷、充換電設(shè)施、分布式光伏等資源聚合應(yīng)用,配置“智能量測終端+多芯智能電表”,完成獨(dú)立計(jì)量和智能控制,在廣州、深圳等地開展虛擬電廠試點(diǎn)。統(tǒng)籌全省虛擬電廠接入、市場交易和協(xié)同控制,逐步培育形成百萬千瓦級(jí)虛擬電廠響應(yīng)能力。(省能源局、工業(yè)和信息化廳,有關(guān)地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(六)加強(qiáng)抗災(zāi)保障新型儲(chǔ)能建設(shè)。依托全省堅(jiān)強(qiáng)局部電網(wǎng)建設(shè),在沿海強(qiáng)風(fēng)區(qū)的7個(gè)地市中心城區(qū)和26個(gè)縣區(qū)中心區(qū)規(guī)劃建設(shè)“110千伏戶內(nèi)站+110千伏電纜+新型儲(chǔ)能”和“新型儲(chǔ)能+10千伏電纜線路+保底用戶”電網(wǎng)。針對(duì)政府、醫(yī)院等重要電力用戶,建設(shè)安全可靠移動(dòng)式或固定式新型儲(chǔ)能電站作為應(yīng)急備用電源。(省能源局,有關(guān)地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(七)探索打造“風(fēng)光儲(chǔ)”微電網(wǎng)。在海島、山區(qū)等可再生能源資源豐富地區(qū),結(jié)合風(fēng)電、光伏發(fā)電等開發(fā),按需配置新型儲(chǔ)能,實(shí)施“新能源+儲(chǔ)能”開發(fā)模式,打造海島、農(nóng)村分布式“風(fēng)光儲(chǔ)”智能微電網(wǎng)。(省能源局,有關(guān)地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(八)大力推動(dòng)新型儲(chǔ)能技術(shù)創(chuàng)新試點(diǎn)示范。建設(shè)省新型儲(chǔ)能制造業(yè)創(chuàng)新中心,加快推進(jìn)產(chǎn)學(xué)研用協(xié)同示范基地和規(guī)?;瘜?shí)證基地建設(shè)。開展“源網(wǎng)荷儲(chǔ)一體化”項(xiàng)目試點(diǎn),開展儲(chǔ)能電站“一體多用、分時(shí)復(fù)用”試點(diǎn)示范。促進(jìn)鈉離子電池、固態(tài)鋰離子電池和液流電池,以及壓縮空氣、飛輪儲(chǔ)能等新型儲(chǔ)能電站試點(diǎn)示范。開展多種儲(chǔ)能技術(shù)聯(lián)合應(yīng)用復(fù)合型儲(chǔ)能試點(diǎn)示范,推動(dòng)大容量、中長時(shí)間尺度新型儲(chǔ)能電站試點(diǎn)示范。(省工業(yè)和信息化廳、發(fā)展改革委、科技廳、能源局,省新型儲(chǔ)能創(chuàng)新中心,有關(guān)地級(jí)以上市政府負(fù)責(zé))
(九)促進(jìn)新型儲(chǔ)能與新型基礎(chǔ)設(shè)施共享融合發(fā)展。加快推進(jìn)新型儲(chǔ)能電站與大數(shù)據(jù)中心、5G基站、數(shù)字電網(wǎng)等新型基礎(chǔ)設(shè)施融合應(yīng)用,在廣州、深圳等電動(dòng)汽車應(yīng)用先進(jìn)地區(qū)智能化改造升級(jí)直流公共快充站,試點(diǎn)建設(shè)直流雙向充電樁,探索規(guī)?;嚲W(wǎng)互動(dòng)。(省發(fā)展改革委、工業(yè)和信息化廳、能源局,省通信管理局,各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
二、強(qiáng)化政策支持
(十)鼓勵(lì)先進(jìn)產(chǎn)品示范應(yīng)用。鼓勵(lì)省內(nèi)儲(chǔ)能生產(chǎn)制造企業(yè)加強(qiáng)技術(shù)創(chuàng)新,推進(jìn)先進(jìn)產(chǎn)品制造,促進(jìn)產(chǎn)業(yè)集聚發(fā)展。加強(qiáng)生產(chǎn)制造企業(yè)產(chǎn)品質(zhì)量抽檢和全生命周期質(zhì)量監(jiān)管,儲(chǔ)能生產(chǎn)制造企業(yè)要強(qiáng)化產(chǎn)品質(zhì)量管理主體責(zé)任,確保生產(chǎn)優(yōu)質(zhì)可靠產(chǎn)品。及時(shí)發(fā)布先進(jìn)優(yōu)質(zhì)產(chǎn)品標(biāo)準(zhǔn)規(guī)范,引導(dǎo)儲(chǔ)能電站項(xiàng)目選擇先進(jìn)優(yōu)質(zhì)可靠產(chǎn)品。用戶側(cè)儲(chǔ)能項(xiàng)目使用產(chǎn)品經(jīng)認(rèn)定符合先進(jìn)優(yōu)質(zhì)產(chǎn)品標(biāo)準(zhǔn)規(guī)范的,其儲(chǔ)能設(shè)施用電量單獨(dú)計(jì)量,電價(jià)參照全省蓄冷電價(jià)政策執(zhí)行。(省工業(yè)和信息化廳、發(fā)展改革委、科技廳、能源局、市場監(jiān)管局,廣東電網(wǎng)公司、深圳供電局,省新型儲(chǔ)能創(chuàng)新中心負(fù)責(zé))
(十一)完善市場價(jià)格機(jī)制。按照國家有關(guān)規(guī)定,獨(dú)立儲(chǔ)能電站向電網(wǎng)送電的,其相應(yīng)充電電量不承擔(dān)輸配電價(jià)和政府性基金及附加。根據(jù)電力供需實(shí)際情況動(dòng)態(tài)調(diào)整峰谷價(jià)差,合理設(shè)置電力中長期市場、現(xiàn)貨市場價(jià)格上下限。(省發(fā)展改革委、能源局,國家能源局南方監(jiān)管局,廣東電網(wǎng)公司、深圳供電局、廣東電力交易中心負(fù)責(zé))
(十二)強(qiáng)化要素保障。對(duì)列入年度計(jì)劃、獨(dú)立占地的新型儲(chǔ)能電站,按公用設(shè)施優(yōu)先安排項(xiàng)目用地。探索利用退役火電機(jī)組既有廠址、輸變電設(shè)施等建設(shè)新型儲(chǔ)能電站。在既有場地建設(shè)新型儲(chǔ)能電站的,簡化優(yōu)化規(guī)劃選址手續(xù)。優(yōu)先保障新型儲(chǔ)能電站土地利用計(jì)劃指標(biāo),各地市在符合行業(yè)標(biāo)準(zhǔn)條件下,優(yōu)化新型儲(chǔ)能電站土地利用指標(biāo)容積率、綠化率要求。對(duì)需要履行環(huán)評(píng)審批手續(xù)的新型儲(chǔ)能電站項(xiàng)目,開辟環(huán)評(píng)審批綠色通道;對(duì)符合條件不需環(huán)評(píng)審批的,依法依規(guī)不納入環(huán)評(píng)管理。優(yōu)化新型儲(chǔ)能電站節(jié)能審查流程,保障項(xiàng)目用能需求。(省自然資源廳、生態(tài)環(huán)境廳、發(fā)展改革委、能源局,各地級(jí)以上市政府負(fù)責(zé))
(十三)強(qiáng)化金融支持。支持新型儲(chǔ)能電站項(xiàng)目使用政策性開發(fā)性金融工具,支持將新型儲(chǔ)能納入綠色金融支持范圍。鼓勵(lì)各地市結(jié)合實(shí)際對(duì)新型儲(chǔ)能電站項(xiàng)目給予財(cái)政扶持。(省發(fā)展改革委、財(cái)政廳、地方金融監(jiān)管局、能源局,人民銀行廣州分行、廣東銀保監(jiān)局、廣東證監(jiān)局,各地級(jí)以上市政府負(fù)責(zé))
(十四)建立激勵(lì)機(jī)制。對(duì)于落實(shí)配置儲(chǔ)能電站要求的新能源發(fā)電企業(yè),在風(fēng)光資源競爭性配置、項(xiàng)目立項(xiàng)、項(xiàng)目并網(wǎng)、調(diào)度運(yùn)行、電力輔助服務(wù)補(bǔ)償考核等方面給予優(yōu)先考慮。根據(jù)用戶配置儲(chǔ)能容量比例,在實(shí)施需求響應(yīng)時(shí)予以適當(dāng)支持。(省能源局、國家能源局南方監(jiān)管局,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
三、健全運(yùn)營調(diào)度機(jī)制
(十五)推進(jìn)新型儲(chǔ)能參與電力市場。按照《廣東省新型儲(chǔ)能參與電力市場交易實(shí)施方案》,獨(dú)立儲(chǔ)能電站可作為獨(dú)立主體參與電力中長期、現(xiàn)貨和輔助服務(wù)市場交易;電源側(cè)儲(chǔ)能電站聯(lián)合發(fā)電企業(yè)作為整體參與電能量市場和輔助服務(wù)市場;用戶側(cè)儲(chǔ)能電站聯(lián)合電力用戶作為整體參與電能量市場和需求響應(yīng)市場。支持虛擬電廠參與市場化需求響應(yīng)交易和輔助服務(wù)市場。(省能源局,國家能源局南方監(jiān)管局,廣東電網(wǎng)公司、深圳供電局、廣東電力交易中心負(fù)責(zé))
(十六)優(yōu)化調(diào)度運(yùn)行機(jī)制。建立健全以市場化方式為主的新型儲(chǔ)能電站調(diào)度運(yùn)行機(jī)制,由電力調(diào)度機(jī)構(gòu)制定新型儲(chǔ)能電站調(diào)度運(yùn)行規(guī)程和調(diào)用標(biāo)準(zhǔn),科學(xué)調(diào)度新型儲(chǔ)能電站。新型儲(chǔ)能電站按照國家能源局南方監(jiān)管局相關(guān)監(jiān)管要求納入并網(wǎng)主體管理。新型儲(chǔ)能電站應(yīng)規(guī)范配置監(jiān)控系統(tǒng)和通訊信息等二次系統(tǒng),按程序向電力調(diào)度機(jī)構(gòu)上傳運(yùn)行信息,接受調(diào)度指令,實(shí)現(xiàn)運(yùn)行數(shù)據(jù)可測、儲(chǔ)能狀態(tài)可控。(省能源局,國家能源局南方監(jiān)管局,廣東電網(wǎng)公司、深圳供電局、新型儲(chǔ)能電站企業(yè)負(fù)責(zé))
四、規(guī)范項(xiàng)目建設(shè)管理
(十七)規(guī)范項(xiàng)目管理。新型儲(chǔ)能電站項(xiàng)目實(shí)行屬地備案管理。各地市能源主管部門根據(jù)省新型儲(chǔ)能電站規(guī)劃,會(huì)同市自然資源、生態(tài)環(huán)境、住房城鄉(xiāng)建設(shè)、消防等部門和電網(wǎng)企業(yè)統(tǒng)籌確定屬地新型儲(chǔ)能建設(shè)需求,以及項(xiàng)目技術(shù)、用地、安全、并網(wǎng)等條件,制定新型儲(chǔ)能電站年度建設(shè)計(jì)劃(不包括用戶側(cè)儲(chǔ)能)并推動(dòng)實(shí)施,根據(jù)情況變化適時(shí)滾動(dòng)修編計(jì)劃。各地市能源主管部門督促納入年度建設(shè)計(jì)劃的新型儲(chǔ)能項(xiàng)目業(yè)主單位加快辦理完成各項(xiàng)建設(shè)手續(xù),推動(dòng)項(xiàng)目及時(shí)開工建設(shè),并按月匯總報(bào)送省能源主管部門。(省發(fā)展改革委、能源局、自然資源廳、生態(tài)環(huán)境廳、住房城鄉(xiāng)建設(shè)廳、消防救援總隊(duì),各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(十八)優(yōu)化并網(wǎng)接入。對(duì)已完成備案并納入年度建設(shè)計(jì)劃的新型儲(chǔ)能電站,其配套接入電網(wǎng)工程視同納入省電網(wǎng)規(guī)劃。電網(wǎng)企業(yè)應(yīng)為新型儲(chǔ)能電站提供電網(wǎng)接入服務(wù),完善配套接網(wǎng)工程項(xiàng)目建設(shè)管理流程,確保接網(wǎng)工程與新型儲(chǔ)能電站建設(shè)進(jìn)度匹配。經(jīng)電網(wǎng)企業(yè)與新型儲(chǔ)能電站單位雙方協(xié)商后,允許新型儲(chǔ)能電站項(xiàng)目單位投資建設(shè)配套接網(wǎng)工程;電網(wǎng)企業(yè)應(yīng)簡化并網(wǎng)流程,提供并網(wǎng)服務(wù)指引和管理規(guī)范,做好并網(wǎng)調(diào)試驗(yàn)收等涉網(wǎng)服務(wù)。(省能源局,各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(十九)提高項(xiàng)目建設(shè)質(zhì)量。新型儲(chǔ)能電站要嚴(yán)格按照國家和行業(yè)有關(guān)標(biāo)準(zhǔn)要求開展電站設(shè)計(jì)、建設(shè)、安裝、竣工驗(yàn)收和運(yùn)營,電站設(shè)計(jì)、施工和監(jiān)理單位應(yīng)具相應(yīng)資質(zhì),新型儲(chǔ)能電站投產(chǎn)前,應(yīng)按照國家相關(guān)規(guī)定組織竣工驗(yàn)收并辦理工程質(zhì)量監(jiān)督手續(xù)。中大型儲(chǔ)能電站應(yīng)選用技術(shù)成熟、安全性能高的電池,審慎選用梯次利用動(dòng)力電池。電網(wǎng)企業(yè)完善新型儲(chǔ)能電站并網(wǎng)準(zhǔn)入細(xì)則,強(qiáng)化儲(chǔ)能電站設(shè)備質(zhì)量技術(shù)標(biāo)準(zhǔn)要求。(新型儲(chǔ)能電站企業(yè),各地級(jí)以上市政府,省工業(yè)和信息化廳、住房城鄉(xiāng)建設(shè)廳、能源局負(fù)責(zé))
(二十)強(qiáng)化安全生產(chǎn)監(jiān)管。新型儲(chǔ)能電站項(xiàng)目單位要按照國家相關(guān)規(guī)定落實(shí)企業(yè)安全生產(chǎn)和消防安全主體責(zé)任,開展電力技術(shù)監(jiān)督工作,做好產(chǎn)品抽樣檢測和儲(chǔ)能設(shè)施全壽命周期監(jiān)管,制定電站運(yùn)行和檢修規(guī)程,定期開展設(shè)備運(yùn)維檢修和電池系統(tǒng)健康狀態(tài)評(píng)估、涉網(wǎng)性能檢測等,加強(qiáng)員工專業(yè)技能培訓(xùn)和考核,建立健全消防安全責(zé)任制和消防安全管理制度,依法定期開展防火檢查、防火巡查和消防設(shè)備檢查,健全微型消防站等消防組織,編制應(yīng)急預(yù)案并定期開展演練。(新型儲(chǔ)能電站企業(yè),各地級(jí)以上市政府,省應(yīng)急管理廳、市場監(jiān)管局、能源局、消防救援總隊(duì)負(fù)責(zé))
(二十一)規(guī)范項(xiàng)目退出管理。新型儲(chǔ)能電站項(xiàng)目單位應(yīng)按照國家相關(guān)規(guī)定定期委托有資質(zhì)的第三方檢測單位進(jìn)行檢測,并及時(shí)組織論證和落實(shí)整改工作,在項(xiàng)目達(dá)到設(shè)計(jì)壽命或安全運(yùn)行狀況不滿足相關(guān)技術(shù)要求時(shí),應(yīng)及時(shí)實(shí)施項(xiàng)目退役,并報(bào)告原備案機(jī)關(guān)。(新型儲(chǔ)能電站企業(yè),各地級(jí)以上市政府,省住房城鄉(xiāng)建設(shè)廳、能源局負(fù)責(zé))
五、強(qiáng)化協(xié)調(diào)保障
(二十二)加強(qiáng)組織領(lǐng)導(dǎo)。各地、各有關(guān)部門要加強(qiáng)對(duì)新型儲(chǔ)能電站建設(shè)工作的領(lǐng)導(dǎo)。省發(fā)展改革委、能源局,國家能源局南方監(jiān)管局及省各有關(guān)單位,積極利用國家、省新型儲(chǔ)能大數(shù)據(jù)平臺(tái),定期跟蹤評(píng)估新型儲(chǔ)能試點(diǎn)項(xiàng)目建設(shè)進(jìn)度,加強(qiáng)儲(chǔ)能建設(shè)運(yùn)行管理,引導(dǎo)新型儲(chǔ)能電站健康發(fā)展。各地市要組織編制年度建設(shè)計(jì)劃,積極協(xié)調(diào)解決相關(guān)問題,為儲(chǔ)能電站項(xiàng)目建設(shè)提供要素保障。(省發(fā)展改革委、能源局,國家能源局南方監(jiān)管局,各相關(guān)部門,各地級(jí)以上市政府,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(二十三)加強(qiáng)協(xié)同監(jiān)管。各地市政府要落實(shí)屬地管理責(zé)任,加強(qiáng)新型儲(chǔ)能建設(shè)、運(yùn)行安全監(jiān)管,督促項(xiàng)目單位嚴(yán)格落實(shí)《國家能源局綜合司關(guān)于加強(qiáng)電化學(xué)儲(chǔ)能電站安全管理的通知》(國能綜通安全〔2022〕37號(hào))要求。各地能源主管部門在實(shí)施新型儲(chǔ)能電站項(xiàng)目備案時(shí),要同時(shí)下達(dá)電力項(xiàng)目安全管理和質(zhì)量管控事項(xiàng)告知書,明確項(xiàng)目需要履行的相關(guān)責(zé)任和義務(wù)。住房城鄉(xiāng)建設(shè)部門依法開展新型儲(chǔ)能電站選址設(shè)計(jì)審查、消防設(shè)計(jì)審查驗(yàn)收備案工作。應(yīng)急管理、消防部門指導(dǎo)新型儲(chǔ)能電站應(yīng)急預(yù)案編制及演練工作,消防部門依法對(duì)項(xiàng)目單位遵守消防法律、法規(guī)的情況進(jìn)行監(jiān)督檢查,嚴(yán)格督促項(xiàng)目單位做好消防隱患整改。能源主管部門、市場監(jiān)管部門、電網(wǎng)企業(yè)負(fù)責(zé)完善新型儲(chǔ)能電站標(biāo)準(zhǔn)體系。電網(wǎng)企業(yè)積極配合開展新型儲(chǔ)能電站的并網(wǎng)和驗(yàn)收工作,杜絕“帶病并網(wǎng)”。(各地級(jí)以上市政府,省住房城鄉(xiāng)建設(shè)廳、應(yīng)急管理廳、市場監(jiān)管局、消防救援總隊(duì)、發(fā)展改革委、能源局,廣東電網(wǎng)公司、深圳供電局負(fù)責(zé))
(二十四)促進(jìn)行業(yè)自律。新型儲(chǔ)能產(chǎn)業(yè)聯(lián)盟、行業(yè)協(xié)會(huì)及研究機(jī)構(gòu)要充分發(fā)揮支撐作用,圍繞新型儲(chǔ)能政策支持、投資運(yùn)營、產(chǎn)業(yè)發(fā)展、技術(shù)創(chuàng)新、標(biāo)準(zhǔn)規(guī)范等,積極組織開展技術(shù)研討、專業(yè)培訓(xùn)和交流合作,促進(jìn)儲(chǔ)能產(chǎn)業(yè)鏈上下游企業(yè)交流互動(dòng),強(qiáng)化行業(yè)自律,營造有序競爭、科學(xué)管理、協(xié)同發(fā)展、合作共贏的市場環(huán)境。(省電力行業(yè)協(xié)會(huì)、省電力規(guī)劃研究中心、省電力設(shè)計(jì)研究院等負(fù)責(zé))
(二十五)建立信息化監(jiān)管平臺(tái)。建立全省新型儲(chǔ)能電站數(shù)據(jù)監(jiān)管平臺(tái),新型儲(chǔ)能電站項(xiàng)目單位應(yīng)按照規(guī)定報(bào)送電池性能、電站運(yùn)行狀態(tài)、隱患排查治理和安全事故事件等信息。新型儲(chǔ)能電站數(shù)據(jù)監(jiān)管平臺(tái)應(yīng)定期向省能源局、國家能源局南方監(jiān)管局報(bào)告儲(chǔ)能運(yùn)行及調(diào)用情況。分批分期推動(dòng)新型儲(chǔ)能數(shù)據(jù)監(jiān)管平臺(tái)與公安、消防、交通等監(jiān)管平臺(tái)對(duì)接,逐步拓展平臺(tái)服務(wù)功能,提升電站信息化管理水平。加強(qiáng)信息化監(jiān)管平臺(tái)網(wǎng)絡(luò)、系統(tǒng)、數(shù)據(jù)安全管理,增強(qiáng)技術(shù)防護(hù)能力,確保平臺(tái)穩(wěn)定運(yùn)用。(廣東電網(wǎng)公司,省能源局,國家能源局南方監(jiān)管局,省公安廳、交通運(yùn)輸廳、應(yīng)急管理廳、消防救援總隊(duì)負(fù)責(zé))
1. Expand diversified applications
(1) Promote the construction of new energy storage for new energy generation. According to the principle of categorical implementation, new offshore wind power projects planned after 2022, as well as newly connected centralized photovoltaic
power stations and onshore centralized wind power projects connected to the grid after July 1, 2023, will allocate new energy storage according to not less than 10% of the installed power generation capacity and a duration of 1 hour, and then adjust
the new energy storage configuration capacity according to the requirements of relevant safety and stability standards of the power system and the actual scale of new energy grid-connected; Encourage existing new energy power generation projects to
allocate new energy storage in accordance with the above principles. Energy storage configuration can be implemented by crowdfunding and co-construction (cluster sharing), leasing or project self-construction, the first of which is organized and implemented
by the city where the project is located. The commissioning time of the new energy storage power station should be no later than the first grid connection time of the project body, and in principle, it should not be configured across prefectures and
cities. By 2025, the scale of new energy storage power stations in the province will be more than 1 million kilowatts, more than 2 million kilowatts by 2027, and more than 3 million kilowatts by the end of the "15th Five-Year Plan" period. (Provincial
Energy Bureau, local level listed governments, Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau, and relevant power generation enterprises are responsible)
(2) Planning and guiding the rational layout of independent energy storage.
In accordance with the principle of rational layout and on-demand construction, power grid enterprises take the lead in researching and proposing the planning and layout of independent energy storage power stations in areas where large-scale new energy
collection and consumption are restricted, power demand fluctuates greatly, transmission corridors and site resources are tight, etc., clarify the scale and distribution of reasonable allocation, and encourage all kinds of social capital to actively
participate in investment and construction. (Provincial Energy Bureau, local level listed government, Guangdong Power Grid Company, Shenzhen Power Supply Bureau are responsible)
(3) Continue to improve the regulation capacity of thermal power joint energy storage. Thermal power units rationally configure new energy storage power stations, jointly participate in market transactions of auxiliary services such as frequency
regulation and backup, continue to expand the application scenarios of fire-storage joint commissioning, and strengthen the tracking and evaluation of demonstration projects. (Provincial Energy Bureau, relevant prefecture-level listed governments,
Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau, and relevant power generation enterprises are responsible)
(4) Vigorously encourage the development of user-side energy storage. In accordance with the principle of adapting measures to local conditions, flexibility and diversity, support industrial and commercial enterprises, industrial parks, etc.
to build new energy storage power stations. Power users with large power consumption such as precision manufacturing, communications, and finance and high requirements for power supply reliability and power quality can configure new energy storage
power stations on demand. Accelerate the deployment of new energy storage power stations in distributed new energy and microgrids, and promote the development of integrated energy services for cooling, heating, electricity and storage in industrial
parks and commercial buildings. (Provincial Energy Bureau, Department of Industry and Information Technology, local level listed governments, Guangdong Power Grid Company, Shenzhen Power Supply Bureau are responsible)
(5) Actively promote the construction of virtual power plants. Promote the aggregation and application of new energy storage power stations and industrial controllable equipment loads, charging and swapping facilities, distributed photovoltaics
and other resources, configure "intelligent measurement terminals + multi-core smart meters", complete independent metering and intelligent control, and carry out virtual power plant pilots in Guangzhou, Shenzhen and other places. Coordinate the access,
market trading and collaborative control of virtual power plants in the province, and gradually cultivate the response capacity of million-kilowatt-level virtual power plants. (Provincial Energy Bureau, Department of Industry and Information Technology,
relevant prefecture-level listed governments, Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau are responsible)
(6) Strengthen the construction of new energy storage for disaster resistance. Relying on the strong local power grid construction of the province, the "110 kV indoor station + 110 kV cable + new energy storage" and "new energy storage + 10
kV cable line + guaranteed user" power grid are planned to be built in 7 central urban areas and 26 counties and central areas in the coastal strong wind area. For important power users such as governments and hospitals, build safe and reliable mobile
or fixed new energy storage power stations as emergency backup power sources. (Provincial Energy Bureau, relevant prefecture-level listed government, Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau are responsible)
(7) Explore the creation of "wind, solar and storage" microgrids. In areas rich in renewable energy resources such as islands and mountainous areas, combined with the development of wind power and photovoltaic power generation, new energy storage
is allocated as needed, and the "new energy + energy storage" development model is implemented to build a distributed "wind, solar storage" smart microgrid for islands and rural areas. (Provincial Energy Bureau, relevant prefecture-level listed government,
Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau are responsible)
(9) Promote the shared and integrated development of new energy storage and new infrastructure. Accelerate the integration and application of new energy storage power stations with new infrastructure such as big data centers, 5G base stations, and digital
grids, intelligently transform and upgrade DC public fast charging stations in areas with advanced application of electric vehicles such as Guangzhou and Shenzhen, pilot the construction of DC two-way charging piles, and explore large-scale vehicle-network
interaction. (Provincial Development and Reform Commission, Department of Industry and Information Technology, Energy Bureau, Provincial Communications Administration, local level listed governments, Guangdong Power Grid Corporation, Shenzhen Power
Supply Bureau are responsible)
2. Strengthen policy support
(10) Encourage the demonstration and application of advanced products. Encourage energy storage manufacturing enterprises in the province to strengthen technological innovation, promote the manufacture of advanced products, and promote the
development of industrial agglomeration. Strengthen product quality sampling and full life cycle quality supervision of manufacturing enterprises, and energy storage manufacturing enterprises should strengthen the main responsibility of product quality
management to ensure the production of high-quality and reliable products. Timely release advanced and high-quality product standards and specifications, and guide energy storage power station projects to select advanced, high-quality and reliable
products. If the products used in the user-side energy storage project are determined to meet the standard specifications of advanced high-quality products, the electricity consumption of its energy storage facilities shall be measured separately,
and the electricity price shall be implemented with reference to the province's cold storage electricity price policy. (Provincial Department of Industry and Information Technology, Development and Reform Commission, Department of Science and Technology,
Energy Bureau, Market Supervision Bureau, Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau, Provincial New Energy Storage Innovation Center are responsible)
(11) Improve the market price mechanism. According to the relevant provisions of the state, if an independent energy storage power station sends electricity to the power grid, its corresponding charging power shall not bear the transmission
and distribution price and government funds and additions. Dynamically adjust the peak-valley price difference according to the actual situation of electricity supply and demand, and reasonably set the upper and lower limits of the medium and long-term
electricity market and spot market prices. (Provincial Development and Reform Commission, Energy Bureau, Southern Supervision Bureau of National Energy Administration, Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau, Guangdong Electric
Power Trading Center are responsible)
(12) Strengthen element safeguards. For new energy storage power stations that are included in the annual plan and occupy an independent land, priority will be given to arranging project land according to public facilities. Explore the use
of existing sites and power transmission and transformation facilities of retired thermal power units to build new energy storage power stations. Where a new energy storage power station is built at an existing site, the procedures for optimizing
planning and site selection shall be simplified. Priority is given to ensuring the land use plan indicators of new energy storage power stations, and all cities are to optimize the requirements of the floor area ratio and greening rate of land use
indicators of new energy storage power stations under the condition of meeting industry standards. For new energy storage power station projects that need to go through EIA approval procedures, open up a green channel for EIA approval; Those who meet
the conditions and do not need EIA approval shall not be included in the EIA management in accordance with laws and regulations. Optimize the energy-saving review process of new energy storage power stations to ensure the energy demand of the project.
(Provincial Department of Natural Resources, Department of Ecology and Environment, Development and Reform Commission, Energy Bureau, local level and listed governments are responsible)
2. Strengthen policy support
(10) Encourage the demonstration and application of advanced products. Encourage energy storage manufacturing enterprises in the province to strengthen technological innovation, promote the manufacture of advanced products, and promote the
development of industrial agglomeration. Strengthen product quality sampling and full life cycle quality supervision of manufacturing enterprises, and energy storage manufacturing enterprises should strengthen the main responsibility of product quality
management to ensure the production of high-quality and reliable products. Timely release advanced and high-quality product standards and specifications, and guide energy storage power station projects to select advanced, high-quality and reliable
products. If the products used in the user-side energy storage project are determined to meet the standard specifications of advanced high-quality products, the electricity consumption of its energy storage facilities shall be measured separately,
and the electricity price shall be implemented with reference to the province's cold storage electricity price policy. (Provincial Department of Industry and Information Technology, Development and Reform Commission, Department of Science and Technology,
Energy Bureau, Market Supervision Bureau, Guangdong Power Grid Corporation, Shenzhen Power Supply Bureau, Provincial New Energy Storage Innovation Center are responsible)